A Fuchs Arquitetura
Office space planning

    https://www.afuchsarquitetura.com/portfolio/perfetti-van-melle-jan-2019/PERFETTI VAN MELLE-JAN/2019

    *Jan/2019 Interior design project of the company’s new reception, located in the city of Vinhedo, SP. Innovative space, bright colors, meeting areas. Renovation works to be initiated soon.

  • https://www.afuchsarquitetura.com/portfolio/elsys-out-2018/ELSYS- OCT/2018

    October/2018 Office space planning. Retrofit of the company’s headquarter offices, located in the city of Valinhos, SP. The furniture was reused but the project focused on improving the acoustic and thermal comfort of employees. 2 Floors building, total area: 2000 m2.

  • https://www.afuchsarquitetura.com/portfolio/ceva-saude-animal-jun-2018/CEVA SAÚDE ANIMAL- JUN/2018

    June/2018. Interior architectural design and construction management of the entire company’s office building, located in the city of Paulínia, SP. Construction time: 90 days. 2 floor building, total area: 850m2 . With reception, workstations, meeting rooms, and breakout space.

  • https://www.afuchsarquitetura.com/portfolio/itw-polymers-brasil/ITW Polymers Brasil-2017/2018

    2017/2018. Interior architecture design and construction management of the renovation of the company ITW Polymers Brasil located in Valinhos. Open office, meeting rooms, restrooms, conference room, breakout space. Area 450m2

  • https://www.afuchsarquitetura.com/portfolio/amcham-campinas/Amcham Campinas-FEB/2018

    February 2018. Architectural Design of the new Amcham Campinas office.

  • https://www.afuchsarquitetura.com/portfolio/bee-creative-marketing-and-communication-agency/Bee Creative – Marketing and Communication agency- AUG/2017

    August 2017. Interior architecture and construction management of the new headquarter of the Marketing and Communication agency, Bee Creative, located at Norte Sul avenue , Cambuí-Campinas/SP. area 220m2. Construction time: 25 day

  • https://www.afuchsarquitetura.com/portfolio/amyris-brotas/Amyris Brasil- Brotas/SP- Mar/2016

    Reception area, Interior design. BEFORE   AFTER   BEFORE   AFTER  

  • https://www.afuchsarquitetura.com/portfolio/nestle-gelato-rio-de-janeiro-feb2016/Nestlé Froneri- Rio de Janeiro-Jul/2016

    Office space, new layout design.  

  • https://www.afuchsarquitetura.com/portfolio/nestle-nbs-ribeirao-preto/Nestlé NBS- Ribeirão Preto-Jan/2016

    Jan/2016. Design of the breakoutspace to increase connectivity among staff members at break or lunch time. The room has a pool table, foosball table, videogame, lounge and coffee area.(pictures to be uploaded soon) 3D IMAGES:

  • https://www.afuchsarquitetura.com/portfolio/amyris-do-brasil-campinassp/Amyris Brasil- Campinas/SP-Jan/2016

    Dez/Jan 2015/2016. Office renovation design, area=800m2. Remodeling the current furniture, 46 work stations, by cutting desktops and screens. New IT and electrical installations according to the space layout developed. Drywall and glasswall were built for conference room (capacity 50 people) and 6 meeting rooms.The reception was also redesigned. Renovation time, 15 days.